calendar

schedule  calendar editing schedule and calendar below
 

You are editing the schedule start date and the schedule type

Schedule:

choose a start date (always a Sunday):


3.8.2026 begin birth control pills
3.17.2026 begin lupron 10u, begin baby aspirin
3.20.2026 last birth control pill
3.22.2026-3.24.2026 expect menses
3.25.2026 baseline ultrasound & blood test
3.27.2026-3.29.2026 stim days 1-3 follistim 4amp in pm
3.30.2026-4.3.2026 stim days 4-8 reduce follistim to 3amp in pm
4.4.2026-4.7.2026 monitoring, possible HCG
4.6.2026-4.9.2026 egg retrieval on one of these days
4.9.2026-4.11.2026 embryo transfer on one of these days

select drug types:
lupron & follistim
lupron & gonal f
synarel & follistim
synarel & gonal f