calendar

schedule  calendar editing schedule and calendar below
 

You are editing the schedule start date and the schedule type

Schedule:

choose a start date (always a Sunday):


2.1.2026 begin birth control pills
2.10.2026 begin lupron 10u, begin baby aspirin
2.13.2026 last birth control pill
2.15.2026-2.17.2026 expect menses
2.18.2026 baseline ultrasound & blood test
2.20.2026-2.22.2026 stim days 1-3 follistim 4amp in pm
2.23.2026-2.27.2026 stim days 4-8 reduce follistim to 3amp in pm
2.28.2026-3.3.2026 monitoring, possible HCG
3.2.2026-3.5.2026 egg retrieval on one of these days
3.5.2026-3.7.2026 embryo transfer on one of these days

select drug types:
lupron & follistim
lupron & gonal f
synarel & follistim
synarel & gonal f